Monday, September 5, 2011

September 2nd & 3rd - Roofing the Studio

Jim and Gerry started roofing the front side of the studio on Friday afternoon.  They installed the metal flashing and got a start on the slate-colored shingles:






By mid-afternoon Saturday, Jim had finished nailing the shingles on the front side:


Then they started the back side which had to be covered with rolled roofing because of the shallow slope.  First, 2 layers of the 30-lb peel-and-stick underlayment (I helped stomp down the air bubbles):



Then the final layer of peel-and-stick white composite shingle material was laid:




Stop for medical treatment...Jim cut himself while trimming the roll:



The backside is done by early evening.  The white color will help keep the studio cool by reflecting the heat:


Jim came back Sunday morning and finished adding the ridge caps.

Perfect timing because it started to rain Sunday afternoon...large drops for a short time.  Then at 2:00 AM Monday morning we both woke to the sound of pounding rain.  Gerry went out to the original garage and bedroom to make sure everything was covered in plastic.  Fortunately, the rain only  lasted about 10-15 minutes.

Thank you, Jim!

August 25 - Before & After Pictures. Visiting Parrots.

The back of the house, before:


After:






The front of the house, before:


After:



New addition, the 630 sq ft shop/studio:



The parrots are still here.  They're eating the bird seed we put out for the neighborhood birds.



Thursday, August 25, 2011

August 24th - Framing is Almost Complete

The pop-out window is complete:

The dining room ceiling is framed:


The double-pocket window between the kitchen and great room is framed:


The roof-line of the back of the house is complete and the chimney (which I totally forgot about) was framed.  This is the view from the back yard; you can't see the chimney from the front of the house unless you're in the middle of the street.

Plywood was laid on the floor of the attic which really helps show how much storage space I'll have up there:




Gerry and kenny installed the sliding glass door in the studio:


I kept hearing an unusual bird sound tonight and found 3 small parrots (cherry-headed Conure Parrots) hanging out in the neighbor's tree.  They reminded me of the documentary, "The Wild Parrots of Telegraph Hill"....a must see. 

Tuesday, August 23, 2011

August 23rd - Pop-out Roof and Great Room Soffit

I have been anxiously waiting for the roof to get framed over the pop-out windows in the dining room:

The soffit and fascia are added to the back of the house:

The soffit is framed around the ceiling in the great room:




Lastly, the roof is sheeted and the two 6-foot skylights are framed over the master bedroom to provide light into the attic storage area:







Monday, August 22, 2011

August 22nd - More Misc Work

Studio - plumbing for the sink:


Sliding glass door threshold/pan was repaired before installation:


Kitchen - the second skylight is opened and the roof is sheeted:


Dining room - Is this a mistake?  No, it's part of the California roof that will go over the top of the existing dining room roof, to tie in the roof over the pop-out window.


Me...up on the roof:




August 20th & 21st - Misc Work

Gerry completes the installation of the second barn door on the back of the studio:



Raymond put spackle over all the nail holes on the fascia then sanded them down:


Gerry drilled holes through the studio to begin the installation of the water, sink, vents & toilet.
 



Saturday, August 20, 2011

August 19th - More Roofing, Fascia and Sheeting

Roofing was added to the garage, and fascia was added to the roof over the front bedroom and the main roof:

Garage from the street side:

The top of the back wall was sheeted:


The vaulted ceiling in the kitchen is framed.  It is a different profile than the roof above it.  The skylights are also framed...the ladder is extended through one of them and the second on the right still has to have the roof cut out.


The soffit around the ceiling in the master bedroom was framed:



Insulation was added to the wall between the front bedroom and the garage:


Bummer...4 of the tub-surround tiles are now cracked from the work on the outside wall: