Roofing was added to the garage, and fascia was added to the roof over the front bedroom and the main roof:
Garage from the street side:
The top of the back wall was sheeted:
The vaulted ceiling in the kitchen is framed. It is a different profile than the roof above it. The skylights are also framed...the ladder is extended through one of them and the second on the right still has to have the roof cut out.
The soffit around the ceiling in the master bedroom was framed:
Insulation was added to the wall between the front bedroom and the garage:
Bummer...4 of the tub-surround tiles are now cracked from the work on the outside wall: