Unload the drywall to the driveway:
We moved Fred's sleeping bag outside to get him out of the way and away from the dust:
Then the workers moved the drywall into each of the rooms:
Gerry called to tell me that the very first piece of dry wall hung was the ceiling in my closet.
Gerry's closet before the walls are dry walled. The tray ceiling is done:
Next, they hung the ceiling in the master bedroom, master bath, the hallway, and the front bedroom. Then the walls were hung. The east side of the house is ready for inspection in the morning. Once it's signed off, the workers can start the tapping and mudding while other workers continue to hang drywall
Looking into the kitchen from the hallway:
Kitchen wall with the sink--the arched window looks into the great room toward the backyard:
Kitchen wall with the stove top under the window and refrigerator to the right:
Kitchen wall--oven and pantry will be to the right of the door which leads to the dining room:
The dining room ceiling:


