Thursday, November 10, 2011

Nov 10th - Final Design for Roof Over Front Porch

The roof over the front porch has been a design frustration for Gerry for years.  He left it off the final drawings so we could wait until the rest of the roof-line was done and he could try different design scenarios.
 

  Yesterday, he made a cardboard mock-up of his final design concept and it works.

Ta-da.....he even used white cardboard to simulate the look of the painted fascia.


Oct 13th thru Nov 9th - Latest House Progress.

The entire roof of the house has been shingled.  We had rain last week and NO leaks!

The last area to roof/seal was around the kitchen skylights.  This is where the rain came in last time.


The two windows in the master bedroom were installed to provide light while Gerry works on the electrical:


Plumbing for the dual sinks in the master bath:


There are electrical outlet boxes everywhere!  It sure beats the two we had per room in the old house.

Wednesday, November 9, 2011

Oct 13th thru Nov 9th - Latest Shop/Studio Progress.

Yes......but I'm behind with this blog because I took a 2-week vacation and visited family in South Carolina.

We don't have gutters along the roof-line yet so Gerry set up some trenches to divert the water runoff into the underground drains.  There is one in front of the shop:


and one along each side of the house:


The man-door on the west side of the shop is installed so now the shop is secure at night and when we're away (another Habitat find):


All the shop windows have been installed including the last two round windows on the upper peaks of the east & west walls:

Gerry has moved his makeshift office from the trailer's dining table to the shop:


Gerry has been working on the rough electrical and plumbing in the shop first:


There are electrical boxes all over the place:



The can light fixtures are installed:



The shop bathroom is functional.  He hung drywall on the surrounding walls (a little privacy, please) and Kenny installed new vinyl flooring (it's now covered by cardboard):





Tuesday, October 11, 2011

October 10th & 11th - More Studio Windows Installed

The north facing studio windows get installed:






Kenny is cutting out the frames for the two round windows that get installed in the studio:



October 10th - Kitchen Skylights Are Installed

The two skylights in the kitchen were installed today.  They're covered in plastic until the roofing around them gets installed.


View from inside the kitchen.  These skylights open.


October 9th - Camping in the master bedroom!

We had company from out of town stay overnight so we set them up in the trailer bedroom and on the fold-down couch.   We set up an air bed in the master bedroom for ourselves.  (My other option was to sleep under the stars on the roof of the studio.  I think I'll save that experience for a warm, summer evening next year!)

Sept. 21st - Oct. 8th What's been happening for the past two weeks?

I was sick for several days while the roofing on the house continued.  All but the roof over the kitchen is complete--we're waiting for the two skylights to be delivered.

Gerry went on vacation to visit his nephew in Tahoe and his brother in Seattle.  Before he left, rain was in the forcast, so he boarded up all the windows and wrapped the entire house and studio in plastic to keep the insulation dry.





We had some rain come in over the kitchen.  I could not find where the water had leaked in.






And  this drop...out of nowhere!