Wednesday, November 9, 2011

Oct 13th thru Nov 9th - Latest Shop/Studio Progress.

Yes......but I'm behind with this blog because I took a 2-week vacation and visited family in South Carolina.

We don't have gutters along the roof-line yet so Gerry set up some trenches to divert the water runoff into the underground drains.  There is one in front of the shop:


and one along each side of the house:


The man-door on the west side of the shop is installed so now the shop is secure at night and when we're away (another Habitat find):


All the shop windows have been installed including the last two round windows on the upper peaks of the east & west walls:

Gerry has moved his makeshift office from the trailer's dining table to the shop:


Gerry has been working on the rough electrical and plumbing in the shop first:


There are electrical boxes all over the place:



The can light fixtures are installed:



The shop bathroom is functional.  He hung drywall on the surrounding walls (a little privacy, please) and Kenny installed new vinyl flooring (it's now covered by cardboard):