Tuesday, October 11, 2011

Sept. 21st - Oct. 8th What's been happening for the past two weeks?

I was sick for several days while the roofing on the house continued.  All but the roof over the kitchen is complete--we're waiting for the two skylights to be delivered.

Gerry went on vacation to visit his nephew in Tahoe and his brother in Seattle.  Before he left, rain was in the forcast, so he boarded up all the windows and wrapped the entire house and studio in plastic to keep the insulation dry.





We had some rain come in over the kitchen.  I could not find where the water had leaked in.






And  this drop...out of nowhere!

Tuesday, September 20, 2011

September 20th - Osborn Roofing on the Job!

Jim came over after work; he started and finished roofing both sides of the garage:






Kenny continued working on the roof over the great room roof and the master suite:


  View of the studio from the house (Gerry was standing on top of the chimney):




Monday, September 19, 2011

September 18th - We Started Roofing the House

Jim came over today and we started roofing the house.  This area is over the master suite and the original bedroom and bathroom:


Jim & Gerry had the first 3 rows of paper laid before I could get the camera and get up on the roof:

The 2 skylights were installed yesterday.  They will provide light into the attic for my storage area:


Jim...hard at work:


First of several vent pipes:


Gerry is bowing to Jim, the Roofing King, at the end of the day:


Jim, "Weeeee....we're done for the day"


Jim showed Kenny how to install the shingles:


Jim, in supervisor mode:


It's Corona time!

We finished about 2/3 of the master suite roof area and got started on the roof over the great room:


Great room:



Thursday, September 15, 2011

September 13th & 14th - Electrical Panel Was Installed

The electrical panel was installed just outside the master bath.  

The inspector was over today and approved the placement of the electrical panel so Gerry can start pulling the wire.  He also gave the go-ahead to install the roof shingles on the house.

Tuesday, September 13, 2011

September 11th - Primer and Plumbing

Please take a moment to remember the people who's lives were lost 10 years ago during the terrorist attacks on the World Trade Center in New York.


God Bless America, My home sweet home.

Gerry installed the drain pipes for the half-bath sink.


Raymond painted primer on the X plywood sheets that will be used to box-in the eaves.  Gerry will cut the plywood to the correct width for installation.  (There was no paint on his short, shirt or shoes when he arrived in the morning!)


He also primered the studio barn doors.



September 10th - Unexpected Rain

We heard the thunder start around 6:45 AM and the rain came around 7:15 AM; unfortunately, Gerry was not home by then and the house does not have a water/weather-proof roof.  The roof is covered with plywood but there are 1/8" gaps between the sheets to allow for expansion.  The water flowed easily downward, through the gaps, and into the house.  I went around and moved Gerry's tools and paperwork to try to keep them dry.  Fortunately, the house plans were in my closet area which already has the floor for the storage attic above installed...that helped keep the closet area dry.

Once Gerry got home, Jonathan--our neighbor from across the street--came over and helped Gerry cover the roof with plastic.  Thank goodness for good neighbors!



Another neighbor joked that he thought the days (years!) of plastic on our roof were over! 

Once the rain stopped Gerry pulled the plastic off to dry out the roof.  Then he recovered the roof just in case the rain came back.


I spent a couple hours vacuuming up as much of the water as possible.  Then we set up fans to help circulate the air and dry out the floors and the storage area above.





Monday, September 5, 2011

September 1st thru 4th - Interior Plumbing is Installed - Vent Pipes

Vent for the kitchen sink:


Vent for the laundry room:


Vent for the utility sink in the laundry room: