Thursday, August 18, 2011

August 18th - The Garage Gets a New Roof and Fascia, Too

The front of the house was also sheeted today:


Raymond painted the fascia boards before they were hung:

August 17th - Insulation Added in the Garage and Outside Original Rooms

The insulation will definately help keep the garage cool on hot days:




The temporary door is now framed to be a window:



August 17th - The Roof Rafters Go Up

View from the studio roof:





Lots of storage over the great room, master bedroom and laundry room.  A pull-down stairway will be installed in the laundry room so I'll have easy access to all my stuff.





Tuesday, August 16, 2011

August 16th - Installed the Largest Ridge Beam

First ridge beams were installed:




View from the studio roof:


Planning for the largest ridge beam:  27' x 6" x 16"













August 16th - Fireplace is Framed

We decided to put the fireplace in the corner of the great room:


This is the fireplace concept from a segment on HGTV.  It has to be modified to work with our raised hearth.






Monday, August 15, 2011

August 15th - Preparing the Outside East Wall

Just beyond the gate on the east side of the house is the bedroom and bathroom we saved from the original house.  The door in this picture was added so we could go in and out of the bedroom and bathroom during the construction.  The opening will become a window in the final plan.


This is the temporary window Gerry built in the remodeled bathroom 15 years ago.  It opens from the top into the bathroom so the screen could be on the outside (my request):


Bathroom from inside:


The bedroom and bathroom windows had to be removed so the framers could work on their outside walls.  The clothes inside the bedroom had to be moved away from the window and the electrical outlet removed from the bedroom ceiling.


Unfortunately, the original framing bowed approximately 1" from the south side of the bathroom across the bedroom window.  Gerry used a saws-all and planer to remove the excess wood so the sheeting will be flush with the rest of the east wall.  Gerry said it wouldn't have made much difference if we were going to stucco the outside, but since we are planning to use siding, the bow in the wall would have been noticeable.




And as luck would have it, the belt on the planer broke at about 6:30 PM.  A replacement is only available by mail order--one week--or at a Sears Repair Center....the closest being in Lakewood and it closed at 5:00 PM.

By the late evening....what a mess inside the bedroom and bathroom!









August 15th - Ceiling Joists Installed

The ceiling joists were installed today:


The framers lifted the heavy beams with brute-strength and their shoulders:









View of ceiling joists from the roof of the garage:


View of the great room toward back of the house:


View from the great room toward the front door:


View from the great room toward my closet in the master bedroom: