Tuesday, August 9, 2011

August 8th - Inspection and Insulation

Hooray....we passed inspection this morning!

The insulation crew was ready and waiting to install the sub-floor insulation.


All the cardboard, tarps and plastic were removed from around the original bedroom and bathroom in preparation for the framers tomorrow.

No more privacy between the bedroom and bathroom and the neighbors!


August 2nd thru 5th - Miscellaneous Work

Final touches on the water, gas and sewer plumbing to get ready for inspection.  Our inspector has been sick for a week but we expect him back in the office on Monday, August 8th.

To test the new sewer for leakage, the end toward the street is plugged with a rubber "balloon" and a 10-foot pipe is filled with water.  If the water level in the pipe does not go down, the sewer pipes are good.


 The hot and cold water lines are filled with water and a gage at the end of the line measures the constant pressure.


Gerry installed a window in the shop bathroom.


Mama found the bird seed and she's eating all the sunflower seeds.


Sunday, Gerry built and hung one of the shop's barn doors.



We also have a hawk that patrols the backyard.  Just before this picture was taken, Gerry saw the hawk swoop down and capture a small bird.  He took it to the neighbors tree where he left in the crook of the branches.  Later, he went back to eat it....we saw the feathers floating down from the tree as he pulled them from the little bird.


My neighbor saw the hawk go after one of the squirrels today, but he didn't catch it.  He'd better not!

July 30th thru August 2nd - Kitchen Plumbing

Plumbing for the kitchen, water, vents and gas was a major project.  Especially the plumbing for the prep sink in the island.  It all took much more time than Gerry expected...and many trips to Home Depot.



Thursday, August 4, 2011

July 31st - Clean Out the Garage

Vincent and I moved most of the stuff from the garage to the shop.  Now the shop is almost full!  Where's Gerry going to park the '47 Ford when it returns?



Check out the window areas...stuff!


No, we didn't forget to move the TV and we set up a small refrigerator:




The windows shown above and the sliding door below were major finds/bargains at Habitat for Humanity.




July 30th - Primer, Plumbing, and Brownies!

Raymond paints the shop eaves with a coat of primer.  Normally, Gerry likes to primer the boards before they're hung, but there was no time or a body to do it.




 He doesn't like heights but he got up on the roof of the shop to paint the dormers!


Kenny puts insulation around all the hot water pipes



Gerry uses his handy-dandy cordless copper pipe cutter.  He says it's one of the best tools he's ever purchased; especially, since he is installing all new copper pipes for 4 bathrooms, the laundry room, and 2 sinks in the kitchen.




And I set up the new toaster oven so I can bake mint brownies (thank you, Debbie) and cookies!

Wednesday, July 27, 2011

July 27th - Roof Dormers Are Built

The dormers were built today:


The dormers are complete:


And Gerry's already got "stuff" inside the shop....and none of it is mine!





July 26th - The Shop Roof is Installed

The walls and roof are complete:


The openings in the roof are for the dormers.


The plywood on the roof has a radiant barrier to help keep the shop cool on hot days.