He built the platform for the spa tub. I can't wait to use it!
The large window over the spa tub will eventually have a leaded glass window. We filled in the space between the studs on the left side wall, between the master
bedroom and the spa tub, for stability and sound proofing.
The shower floor has been started. Gerry's not going to hot mop it; he plans to use a new waterproofing product call the Schluter-Kerdi Shower System
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.