We spent all three HOT days preparing for the framing to start in a couple weeks.
Gerry decided to remove several of the original floor joists because they were twisted. He also added a couple new footings because a pair of the original footings were too close to the new sewer ditch. Better to add them now then to have issues later.
Before:
After:
Gerry & Kenny demo'd the remaining walls on the house-side of the garage and the hallway.
I had to empty the linen closet and bathroom storage closet in the hallway outside the bathroom.
Show pic of hallway w/o closets
Final placement of the main sewer which shifted as the surrounding sand was washed down the line during all the rain a few months ago. Just make sure it slopes in the right direction!