July 4th Weekend - Final Preparations for Framing

We spent all three HOT days preparing for the framing to start in a couple weeks.

Gerry decided to remove several of the original floor joists because they were twisted.  He also added a couple new footings because a pair of the original footings were too close to the new sewer ditch.  Better to add them now then to have issues later.

Before:

After:

Gerry & Kenny demo'd the remaining walls on the house-side of the garage and the hallway.



I had to empty the linen closet and bathroom storage closet in the hallway outside the bathroom.




                                            Show pic of hallway w/o closets                    


Final placement of the main sewer which shifted as the surrounding sand was washed down the line during all the rain a few months ago.  Just make sure it slopes in the right direction!